Post office in Avila

Rehabilitation of ground and lower-ground floors and specific interventions on the roof and the rest of the building.

The main pathologies to be solved were water leaks and damp on the lower-ground floor. To solve the problems, we carried out a concrete slab with a ventilation chamber, a drainage system with the installation of bilge pumps and a wireless electro-osmosis system to reverse the polarity of rising damp.

Project Details

  • Year:
    2014
  • Type of construction:
    Historic Building Rehabilitation
  • Location:
    Ávila
  • Collaboratos:
    mmarq Arquitectura e Ingeniería - www.mmarq.es
  • Date:
    August 12, 2019