Post office in Avila
Rehabilitation of ground and lower-ground floors and specific interventions on the roof and the rest of the building.
The main pathologies to be solved were water leaks and damp on the lower-ground floor. To solve the problems, we carried out a concrete slab with a ventilation chamber, a drainage system with the installation of bilge pumps and a wireless electro-osmosis system to reverse the polarity of rising damp.
Project Details
-
Year:2014
-
Type of construction:Historic Building Rehabilitation
-
Location:Ávila
-
Collaboratos:mmarq Arquitectura e Ingeniería - www.mmarq.es
-
Date:August 12, 2019